Project Brief
The progressive design aims at creating a Tier 4 Data Center Facility with fully compartmentalized data zones (8), e-trust, POPs (2) and MDFs (2). The complex provides direct circulation between spaces, horizontally and vertically. Utility runs (power, piping, data) are organized with maximum efficiency and direct routing. The facility is designed to achieve LEED Gold-certification.